Perkins Generator Terms of Service
Last updated: July 30, 2026
Website information
This website provides general product, application, and smart-power information. It does not replace a project specification, certified submittal, installation drawing, operating manual, local code review, or advice from a qualified engineer.
Quotations and availability
Any quotation is subject to its stated scope, assumptions, exclusions, validity period, payment terms, delivery basis, and written acceptance. Ratings, options, lead times, and availability must be confirmed for the specific request.
Application responsibility
Users are responsible for supplying accurate load, site, environmental, fuel, electrical, and operating information. Final selection and installation must be reviewed by appropriately qualified parties and comply with applicable requirements.
Acceptable use
You may not misuse the website, interfere with its operation, submit unlawful material, attempt unauthorized access, or reproduce protected content beyond lawful use.
Limitation
To the extent permitted by law, Perkins Generator is not liable for decisions made solely from general website information or for indirect losses arising from website use.
Contact
Questions about these terms may be submitted through the contact page.
